“Application Of Metal-Semiconductor (Msm) Photodetectors For Transverse And Longitudinal Intra-Bunch Beam Diagnostics”. Oxford, UK: IBIC'13, 2013. doi:
. “A Multiband-Instability-Monitor For High-Frequency Intra-Bunch Beam Diagnostics”. Oxford, UK: IBIC'13, 2013. doi:SOURCE.
. “Options For The Design Of The New Pick-Up And Schedule”. LIU-SPS High Bandwidth Damper Review: CERN, 2013. doi:SOURCE.
. “Planned & Possible Upgrades Related To: Lhc Inter- And Intra-Bunch (Head-Tail) Diagnostics”. Review on Functional Requirements on LHC Transverse Instability Diagnostics after LS1: CERN, 2013. doi:SOURCE.
. “Planned & Possible Upgrades Related To: Lhc Long-Range Beam-Beam Compensator & Lhc Head-Tail Diagnostics”. CERN Machine Advisory Committee: CERN, 2013. doi:SOURCE.
. “Status And Plans For The Analogue And Digital Electronics”. BI/OP Technical Board: CERN, 2013. doi:SOURCE.
. “Wcm Satellite Measurements For The 2013 Vdm Scans”. LHC Luminosity Calibration & Measurement Working Group: CERN, 2013. doi:SOURCE.
. “Wcm-Based Satellite Measurements During The November'12 Vdm Scans”. LHC Luminosity Calibration & Measurement Working Group: CERN, 2013. doi:SOURCE.
. “Fast Inter/intra-Bunch Activities Related To Clic And Lhc”. BI-QP: CERN, 2012. doi:SOURCE.
. .
“Storage Ring Tune Measurements Using High-Speed Metal-Semiconductor-Metal Photodetector”. CERN, 2012. doi:
. “Wall-Current-Monitor Based Ghost And Satellite Bunch Detection In The Cern Ps And Lhc Accelerators”. BI Seminar: CERN, 2012. doi:SOURCE.
. “Wall-Current-Monitor Based Ghost And Satellite Bunch Detection In The Cern Ps And Lhc Accelerators”. BI Technical Board: CERN, 2012. doi:SOURCE.
. “Wall-Current-Monitor Based Ghost And Satellite Bunch Detection In The Cern Ps And Lhc Accelerators”. Newport News, Virginia: BIW'12, 2012. doi:SOURCE.
. “Wcm-Based Satellite Measurements During The July 2012 Vdm Scans”. LHC Luminosity Calibration & Measurement Working Group: CERN, 2012. doi:SOURCE.
. “Be-Bi Options For Satellite, Ghost, Debunched Beam And Bunch Length Measurements”. BI Technical Board: CERN, 2011. doi:SOURCE.
. “Be-Bi Options For Satellite/ghost Measurements”. CERN, 2011. doi:SOURCE.
. “Fast Inter/intra-Bunch Activities Related To Clic And Lhc”. CERN, 2011. doi:SOURCE.
. “Head-Tail Daq Upgrade”. BI Technical Board: CERN, 2011. doi:SOURCE.
. “Bi Wall-Current-Monitor Description Of The Required Fesa Class Functionality”. BI Technical Board: CERN, 2010. doi:SOURCE.
. “Existing Sps And Lhc Instrumentation For Crabbed Beams”. LHC Crab Cavity Workshop: CERN, 2010. doi:SOURCE.
.